Monday, June 13, 2011

Bathroom Progress

Progress was made in the bathroom last week. The tub deck was built thanks to Mitch and a friend from church. They put that thing together in no time flat. Here's its current state.



We looked into having a piece of granite or other stone cut for the top of the tub deck but it was too pricey. So on to Plan B: tile the top. Hopefully it'll look something like this one.

Kohler Archer Drop-In Tub with Daltile Subway Tile in Kohler White 1

And we're going to panel the front sorta like this.

2010 Coastal Living Ultimate Beach House: Master Bath Details

We chose this tub faucet


And this is our shower faucet


Mitch built this recessed cabinet the other day for towels and the like. We'll have our cabinet guy make a door for it.


And as for the floor, I have my heart set on stone/marble. I'd love to have a floor like Tommy Symth's. I'm in love with the herringbone pattern. It's something that's unique and you don't see everyday. I think that's why I love it so much.



Source: decorpad.com via Kat on Pinterest


So that's where we're at. It's slow in the making since we're doing it debt-free but I know it'll be worth it in the end. Hang in there, guys! (I have to keep telling myself that too!) Hopefully soon I'll show ya a finished bathroom:)

3 comments:

  1. Its really coming along isnt it i cant wait to see the finished result

    ReplyDelete
  2. Oh I am so jealous of your tub. I love the panel surrounds and think it will fit in with your style so well!

    ReplyDelete
  3. In the event that you are thinking about going for washroom rebuilding Los Angeles ca then there are a portion of the contemplations that you have to make. see here now

    ReplyDelete

Blogging tips